Watch this recorded webinar featuring the Big Cloud Fabric team as they discuss the industry's first unified physical + virtual SDN fabric for deploying resilient OpenStack clouds.
Watch Now
The Edge Computing Digital Symposium is a two-day event featuring Heavy Reading’s principal analyst, Jennifer P. Clark. Join her alongside industry experts as they discuss the most significant trends driving edge computing into 2022 and beyond.
Watch Now
The rollout of 5G brings with it all the possibilities of new services, more opportunities to scale, and accelerating growth. It also brings more complexity to today’s networks. With growth, the level of operations becomes increasingly difficult with new software demands and multiple tools managing ever-changing technologies. A new operations model is required to handle all of this.
Watch Now
Data centres are a critical component of the 21st century digital economy, and as their energy footprint grows, they will play a larger role in Europe's power system. In this webinar, executives from Eaton and Statkraft will discuss the outlook for data centres and the low-carbon energy transition, and the potential for data centres themselves to help integrate renewables on the grid. Experts from BloombergNEF will share the results of a recent study focusing on the future of data centres in the UK, Ireland, Norway, Netherlands and Germany.
Watch Now